Ubicación Principal
Recoleta, Asunción
Detalles de la Propiedad
•
Tipo de Propiedad
Departamento
•
Estado
En Pozo
•
Baños
1
•
Antigüedad del inmueble
•
Dormitorios
Monoambiente
•
Garajes
•
Financiación
•
Orientación
N
•
M² edificados
30 m2
•
M² de terraza
30 m2
•
Barrio Privado
•
Referencia
B2B9C3
•
Sobre
No aplica
•
Zona
Recoleta
•
Disposición
Al frente
•
Gastos Comunes
•
Piso
•
Cantidad de Pisos
1
•
Acepta permuta
•
Vivienda Social
•
Apto para Oficina
No
•
Penthouse
No
Descripción
51499 - VICTORIA PONCE
Apartments under construction in Recoleta
Venire 568, Recoleta, designed for those who choose to experience the city differently. A project distinguished by its design, where materials such as concrete, steel, and brick are integrated from the facade to the interior courtyard.
4 blocks from Mariscal Shopping Center, 2 blocks from "La Cuadrita" (a local landmark). Located on the corner of Manuel del Castillo and San Roque González streets.
88 apartments, 11 apartments per floor, 8 floors.
Studio apartments of 30.79 m² starting at USD 60,164.
1-bedroom apartments of 45.86 m² starting at USD 89,427.
2-bedroom apartments of 84.49 m² starting at USD 160,531.
Parking spaces: USD 15,000.
All units feature a living/dining room, furnished kitchen, air conditioning in every room, and bedrooms with built-in closets.
Construction begins March 2027. Completion ends March 2029.
Apartments under construction in Recoleta
Venire 568, Recoleta, designed for those who choose to experience the city differently. A project distinguished by its design, where materials such as concrete, steel, and brick are integrated from the facade to the interior courtyard.
4 blocks from Mariscal Shopping Center, 2 blocks from "La Cuadrita" (a local landmark). Located on the corner of Manuel del Castillo and San Roque González streets.
88 apartments, 11 apartments per floor, 8 floors.
Studio apartments of 30.79 m² starting at USD 60,164.
1-bedroom apartments of 45.86 m² starting at USD 89,427.
2-bedroom apartments of 84.49 m² starting at USD 160,531.
Parking spaces: USD 15,000.
All units feature a living/dining room, furnished kitchen, air conditioning in every room, and bedrooms with built-in closets.
Construction begins March 2027. Completion ends March 2029.
Financiación
Importe a Solicitar
Plazo
10
Tipo de Préstamo
Financiación
Comprá esta propiedad con la mejor financiación del mercado.



.jpg)
