Ubicación Principal
Herrera, Asunción
Detalles de la Propiedad
•
Tipo de Propiedad
Casa
•
Estado
Excelente estado
•
Baños
1
•
Antigüedad del inmueble
•
Dormitorios
1
•
Garajes
•
Financiación
•
Orientación
No aplica
•
M² edificados
300 m2
•
M² del terreno
7.270 m2
•
Barrio Privado
•
Referencia
JF358E
•
Sobre
No aplica
•
Zona
Herrera
•
Disposición
No aplica
•
Piso
•
Cantidad de Pisos
•
Acepta permuta
•
Vivienda Social
•
Apto para Oficina
No
Descripción
Apartments under construction in Recoleta
Venire 568, Recoleta, designed for those who choose to experience the city differently. A project distinguished by its design, where materials such as concrete, steel, and brick are integrated from the facade to the interior courtyard.
4 blocks from Mariscal Shopping Center, 2 blocks from "La Cuadrita" (a local landmark). Located on the corner of Manuel del Castillo and San Roque González streets.
88 apartments, 11 apartments per floor, 8 floors.
Studio apartments of 30.79 m² starting at USD 60,164.
1-bedroom apartments of 45.86 m² starting at USD 89,427.
2-bedroom apartments of 84.49 m² starting at USD 160,531.
Parking spaces: USD 15,000.
All units feature a living/dining room, furnished kitchen, air conditioning in every room, and bedrooms with built-in closets.
Construction begins March 2027. Completion ends March 2029.
Venire 568, Recoleta, designed for those who choose to experience the city differently. A project distinguished by its design, where materials such as concrete, steel, and brick are integrated from the facade to the interior courtyard.
4 blocks from Mariscal Shopping Center, 2 blocks from "La Cuadrita" (a local landmark). Located on the corner of Manuel del Castillo and San Roque González streets.
88 apartments, 11 apartments per floor, 8 floors.
Studio apartments of 30.79 m² starting at USD 60,164.
1-bedroom apartments of 45.86 m² starting at USD 89,427.
2-bedroom apartments of 84.49 m² starting at USD 160,531.
Parking spaces: USD 15,000.
All units feature a living/dining room, furnished kitchen, air conditioning in every room, and bedrooms with built-in closets.
Construction begins March 2027. Completion ends March 2029.
Financiación
Importe a Solicitar
Plazo
10
Tipo de Préstamo
Financiación
Comprá esta propiedad con la mejor financiación del mercado.




